1. In most cases, it will not be necessary to modify duct sizing when installing a zoning system.
2. It is a good practice to size the smallest zone to handle approximately 25% of the system CFM.
3. Never undersize the ductwork.
4. Upsizing registers in the smallest zone to the next larger size should be considered.
5. You can double the rated CFM of a register before it starts to become noisy.
6. Multi-stage equipment is always a better choice with a zoning system.
7. It is always better to slightly undersize the HVAC equipment than to oversize it.
8. Never locate a thermostat in a hallway.
9. Dampers should be installed at least 2 feet away from the plenum when possible.
10. Always use a separate 24 volt transformer to power the zone panel. Do not use the equipment transformer.
11. Always tag all wires, especially from dampers and thermostats.
12. Some basements may require setting the zone thermostat in the auto mode during the cooling season for the following reasons: basement walls are cold as a result of being underground, uninsulated ductwork located in the basement acts as a cooling radiator, ductwork leaking air, cold air falls.

For questions about zoning or for a quote on a zoning system, call us at 888.652.9663.

Updated: April 23, 2014 — 8:26 am

Leave a Reply

Your email address will not be published. Required fields are marked *